跳至主要內容

Three wire "Ignition Time" to increase "Run Time" field for better data and MyGeotab integrations

paul-1080
原始發文者

It seems quite obvious that the 3 wire harness installs would still be able to provide relatively accurate Run Time if Geotab used the Ignition Time measurement to increase the Run Time field on the asset page. Then, when integrations for maintenance programs are built we'd still be able to use this field.

 

Is there anyway to make this happen with a special parameter?

加入對話

You need to be logged in to reply to this post and participate in the Geotab Community discussions.

熱門解答

EishiFUN
社群管理員

Thank you for giving us feedback about this in our Feedback Hub. I just wanted to link the submission here for anyone else who is interested in this: Accurate Run Time based on Ignition On Time for 3 wire installs

2 則回覆

Hey, @paul-1080​!

​

Is the problem here that you're not getting Ignition = on under Measurements in MyGeotab? If so, I'm thinking you should be able to build this as a Rule based on whatever is being triggered (perhaps an AUX?) and then look this up as an Exception.

​

Let me know if this helps you at all, or if you need to discuss further. 🤔😅

​

​Best,

Joy B

EishiFUN
社群管理員

Thank you for giving us feedback about this in our Feedback Hub. I just wanted to link the submission here for anyone else who is interested in this: Accurate Run Time based on Ignition On Time for 3 wire installs

還有問題嗎?