본문으로 바로가기

Three wire "Ignition Time" to increase "Run Time" field for better data and MyGeotab integrations

paul-1080
원글 작성자

It seems quite obvious that the 3 wire harness installs would still be able to provide relatively accurate Run Time if Geotab used the Ignition Time measurement to increase the Run Time field on the asset page. Then, when integrations for maintenance programs are built we'd still be able to use this field.

 

Is there anyway to make this happen with a special parameter?

대화에 참여하기

You need to be logged in to reply to this post and participate in the Geotab Community discussions.

최고 답변

EishiFUN
커뮤니티 관리자

Thank you for giving us feedback about this in our Feedback Hub. I just wanted to link the submission here for anyone else who is interested in this: Accurate Run Time based on Ignition On Time for 3 wire installs

답글 2개

Hey, @paul-1080​!

​

Is the problem here that you're not getting Ignition = on under Measurements in MyGeotab? If so, I'm thinking you should be able to build this as a Rule based on whatever is being triggered (perhaps an AUX?) and then look this up as an Exception.

​

Let me know if this helps you at all, or if you need to discuss further. 🤔😅

​

​Best,

Joy B

EishiFUN
커뮤니티 관리자

Thank you for giving us feedback about this in our Feedback Hub. I just wanted to link the submission here for anyone else who is interested in this: Accurate Run Time based on Ignition On Time for 3 wire installs

여전히 궁금한 점이 있으신가요?